Project: Battery energy storage facility and substation
Project duration: 03/2026–09/2027
Value: Approx. EUR 10 million
Status: Ongoing
Client: Nordic BESS Finland 1 Oy / Delta Capacity
Location: Lapinlahti, Finland
Business area: Energy / BESS
Contact person: Pauli Lahti
NYAB is delivering a 150 MW / 300 MWh battery energy storage facility (BESS) in Lapinlahti in collaboration with Nordic BESS Finland 1 Oy / Delta Capacity. The project will support power system flexibility and enable more efficient utilisation of renewable energy to meet the needs of a growing energy infrastructure.
The scope of the project includes the construction of the battery energy storage facility and its associated substation. The contract comprises, among other things, two 110 kV transformer bays, one cable feeder bay, and approximately 400 metres of 110 kV underground cabling from Fingrid’s Alapitkä substation to the new BESS substation. In addition, NYAB is responsible for the earthworks and foundations for the battery storage equipment, equipment installation and lifting operations, cabling and electrical connections, as well as testing, commissioning, and energisation of the substation.
The project, valued at approximately EUR 10 million, commenced in March 2026 and is scheduled for completion in September 2027.