Collision-free road with bridges and new infrastructure between Svensbyn and Vitsand NYAB upgraded the road section between Svensbyn and Vitsand to create a safer and more accessible environment for motorists, cyclists and pedestrians. Read more
Reconstructing E4 Sikeå while maintaining traffic Reconstructing and widening the E4 under live traffic to improve road safety and traffic flow along a key transport route in northern Sweden. Read more
Collaborative infrastructure works for the Municipality of Luleå NYAB delivers the planning and execution of infrastructure works for the Municipality of Luleå under a long-term framework agreement. Read more
Maintaining 859 km of state roads in Kalix NYAB is responsible for the operation and maintenance of the state road network in the Kalix area, ensuring year-round accessibility, safety and functionality. Read more
Maintaining 1,123 km of state roads in Piteå NYAB is responsible for the operation and maintenance of the state road network in the Piteå area, ensuring year-round accessibility, safety and functionality. Read more
Maintaining 832 km of state roads in Boden NYAB is responsible for the operation and maintenance of the state road network in the Boden area, ensuring year-round accessibility, road safety and functionality. Read more
First BEST phase on the North Bothnia Line Delivering the first BEST phase of the North Bothnia Line, building new railway infrastructure between Umeå and Dåva. Read more
Upgrading the Silverhöjden Line during a planned line closure Upgrading a 150-year-old railway to improve capacity and reliability on the line between Grängesberg and Ställdalen. Read more
Maintaining 938 km of State Roads in Överkalix and Övertorneå NYAB is responsible for the operation and maintenance of the state road network in the Överkalix and Övertorneå area, ensuring year-round accessibility, safety and… Read more
Pyhäjärvi and Haapajärvi bridges The Pyhäjärvi and Haapajärvi bridge project combines the construction of a new waterway bridge and the refurbishment of an existing bridge. Read more
Leviäkumpu BESS Leviäkumpu in Kemijärvi is one of the northernmost battery storage projects of its kind, showcasing NYAB’s energy storage expertise. Read more
Ossauskoski fish hatchery The Ossauskoski fish hatchery will strengthen domestic fish stocks and support sustainable stocking for the future Read more
SSAB’s new research center and factory office NYAB was responsible for the construction of a new research and laboratory center, along with an associated office building. Read more
Isosuo solar photovoltaic power plant in Utajärvi The Isosuo Solar Park in Utajärvi is a significant renewable energy project that, once completed, will produce approximately 97 GWh of solar electricity with… Read more
Utanen and Isokangas 110kV substations The assignment involves an expansion project of the switchgear at the 110 kV substations in Utanen and Isokangas. Read more
Earthworks for Talga’s battery anode refinery NYAB begins the earthworks at Talgas’ new battery anode refinery located in Luleå Industrial Park. Read more
Aurora Line The Aurora Line is a new 380-kilometer-long 400 kV power line between Sweden and Finland, jointly built by the transmission system operators Svenska Kraftnät… Read more
Yara Siilinjärvi factories NYAB is supplying three buildings for Yara's project initiated in 2022: a sulfur storage facility, the melting plant building, and its electrical control room. Read more
EASA-widening Arlanda Airport Swedavia operates ten airports in Sweden, of which Arlanda Airport, just outside Stockholm, is the largest and busiest. In May 2023, NYAB Mälardalen was… Read more
Karahka wind farm Oulainen, a municipality in Finland’s North Ostrobothnia region, is set to become home to a large-scale wind farm with 25 wind turbines, with an… Read more
Construction of Pump station DE289 and disaster pipeline Excavation work, pipeline bed, protective fill, remaining fill. Laying of line approx. 600 meters with dimension 1200-250mm, Pipe pressing hammer drilling of 8 160mm… Read more
E10 Highway in Kiruna In 2017, NYAB was assigned by the Swedish Transport Administration to begin construction work on the new national highway E10 in Kiruna. The project… Read more
Gammelstad combi terminal and new railway tracs In the main, the object is covered by demolition of existing structures, land, track, electricity/lighting, cable laying, new construction of track, construction of loading… Read more
The Haparanda train track, platforms in Kalix & Haparanda In 2020, NYAB was assigned by the Swedish Transport Administration to carry out reparation work at the train station platforms and tracks in Haparandra… Read more
Lindbäcks super factory In 2015, NYAB was assigned to, in collaboration with Lindbäcks, do the groundwork for their new super factory at Haraholmen in Piteå. When completed,… Read more
M15 Hematit Vitåfors The contract was an execution contract carried out by NYAB Sverige AB. The project redevelopment and extension of an industrial building with a concrete… Read more
Piteå Port & Hub – Stage 3 The project included shafting and filling works for new terminal surfaces and connecting road. Asphalting in several layers of terminal surface and connecting road,… Read more
Teräväniemi wastewater treatment plant Äänekoski is a lively industrial city of about 18,000 residents located at the southern end of lake Keitele in Central Finland. Äänekosken Energia Oy… Read more
Mikonkeidas wind farm The construction work for Mikonkeidas wind farm in Kristiinankaupunki has been started. During 2023, the construction will focus on building the infrastructure of the… Read more
Relocation of cultural buildings In the communities of Malmberget, Gällivare and Koskullskulle, a large project is currently underway with the social transformation of the three urban areas. In… Read more
Norrskogen wind park NYAB provided the foundations for 17 wind turbines for EPV Tuulivoima Oy at the Norrskogen wind farm in Närpiö. Read more
Juurakko wind farm The Juurakko wind farm in Kalajoki, Finland, built for VSB Uusiutuva Energia Suomi Oy, was completed according to plan and on schedule. The wind… Read more
House relocation & land Relocation of cultural construction, casting, water & sewage system and constuction of new developed housing area. Read more
Bridge over GC road Construction of bypass for Riksväg 45 before the start of the bridge construction. Read more
Fiber work Customer: Övik energi AB Year: 2019 Total: 13 million SEK Location: Domsjö and Vårbystrand Contractor type: Execution contract Sealing of existing fiber network within… Read more
PT33 Vaikijaur Shafts, filling, concrete, ducting, maneuvering, fences for 130kV and 40kV switchgear. Read more
The Lillholmschool Demolition of 3 school buildings, land and water works for two new school buildings. Read more
NLC Storuman phase 2 – Triangular tracks Terracing for a new railroad between the terminal and the inland track. Read more
Pajuperänkangas wind farm NYAB builds wind farm for ABO Wind in Pajuperänkangas in Haapajärvi. The contract includes wind farm roads, lifting areas, foundations, and electrical cabling work… Read more
Lumivaara wind farm NYAB is building the Lumivaara Wind Farm in the municipality of Hyrynsalmi in Kainuu. Eight German Nordex N163 5.7 MW wind turbines will be… Read more
Poikkimaantie bridge across Oulujoki river meets the needs of the growing city of Oulu and the port NYAB is involved in the development of the largest neighbourhood to be built in Northern Finland in the next few decades, Hiukkavaara in Oulu. Read more
Jokikylä bridge in Oulu During the project, a completely new bridge over the River Kiiminkijoki will be built to replace the existing bridge located on the connecting road… Read more
Sitema to design Herva-Nuojuankangas power line Sitema Oy has been selected as the general design consultant for Fingrid's 400kV Herva-Nuojuankangas power line. The power line is located in Northern Ostrobothnia.… Read more
NYAB is building pumping stations of Tampere region’s new central wastewater treatment plant NYAB started in June 2022 building of two pumping stations that serve the entirety of the Tampere region and many of its neighbouring municipalities. Read more
NYAB is building a power distribution station of Fingrid’s substation in Oulu The service security of the City of Oulu’s electricity supply will improve when Fingrid replaces the Leväsuo substation. The station is an important part… Read more
Kaukanen wind park in Kannus The construction and ejecting of the wind park of Puhuri Oy's sister company Tuulikaarron Voima Oy was completed in October 2022, and the park… Read more
Valkeakoski surface water treatment plant The new surface water treatment plant in Tyrynlahti is an important water production plant for Valkeakoski since it produces almost all the drinking water… Read more
Jämsä water treatment plant NYAB constructed the expansion part of the Jämsä central treatment plant and managed the structural works for the renovation of the old treatment plant. Read more
Unique protection against excavation by blasting in the style of Formula 1 LKAB is extracting ore in the open-pit mine in Svappavaara. At the time of the blasting, the area must be thoroughly cleared. Read more
Additional building for pellet storage at Norrenergi The energy company Norrenergi wanted to divide a pellet storage into two parts at the district heating plant in Solna Strand. Read more
Pajukoski wind farm NYAB flagship project of wind power construction was completed early in Ylivieska. Read more
Tampere outdoor swimming pool After decades, the wish of Tampere residents for an outdoor swimming pool was fulfilled when an oasis was opened in the middle of the… Read more
Kalajoki central water treatment plant The Kalajoki central treatment plant, built by NYAB for Vesikolmio Oy, is a significant environmental investment that, among other things, improves the quality of… Read more
Kuuronkallio wind farm In the wind farm project of WPD Finland Oy in Kuuronkallio, Kannus, NYAB built the foundations of 14 wind turbines. The production of the… Read more
LKAB’s LabSAK project LKAB's goal is to produce the best pellets in the world, and LKAB invests heavily in research and development. Read more
Nenäinniemi sewage treatment plant The Nenäinniemi sewage treatment plant in Jyväskylä plays a major role for the entire region. The treatment plant treats sewage from approximately 160,000 residents,… Read more
Haapajärvi biothermal plant NYAB carried out the construction of a new biothermal plant in Haapajärvi for Haapajärven Lämpö Oy. Read more