Wind park construction (BoP)

Balance of Plant (BoP) construction refers to the infrastructure and electrical work of a wind park, covering all construction with the exception of turbines. Skarta specialises in BoP projects and has been involved in the construction of more than a hundred wind power plants.

In BoP projects, our experts take charge of the bigger picture, starting with design and soil research. We then move on to constructing the lifting zones and the foundations, including challenging concrete casting. We also build the internal power network of the wind park, including cable installations, and connect it to the national grid. Moreover, we carry out any auxiliary work needed by the wind park, such as repair or construction of the road network. In addition to BoP projects, we are happy to respond to requests for tenders concerning smaller concepts as well, according to the customer’s needs.

Contact us!

Daniel Johansson

Business Area Manager, Industry & Energy

+46 70 362 24 13
daniel.johansson@nyabab.se

Robert Säthergren

Project Engineer

+46 70 600 52 92
robert.sathergren@nyabab.se

Jaakko Tyyvi

Wind power construction, Project Director, Finland

+358 40 154 1658
jaakko.tyyvi@nyabgroup.com

Tuomas Visuri

Tuomas Visuri

Solar power construction, Finland

+358 40 091 2002
tuomas.visuri@nyabgroup.com