Our work

Construction of Pump station DE289 and disaster pipeline

Earthworks as below Excavation work, pipeline bed, protective fill, remaining fill. Laying of line approx….

Read more

Highway E10 Kiruna

Highway E10 Kiruna (Phase 1 and 2) 11 km new road inclusive 13 bridges (concrete…

Read more

Gammelstad combi terminal and new railway tracs

In the main, the object is covered by demolition of existing structures, land, track, electricity/lighting,…

Read more

Haparandabanan, platforms in Kalix & Haparanda

Train station in Kalix, picture: Norrtåg Haparandabanan, platforms in Kalix & Haparanda Shaft & filling,…

Read more

Lindbäcks superfactory

The contract was a turnkey contract in collaboration for Lindbäck’s building at Haraholmen Piteå. The…

Read more

M15 Hematit Vitåfors

The contract was an execution contract carried out by NYAB Sverige AB. The project redevelopment…

Read more

Piteå Port & Hub – Stage 3

The project included shafting and filling works for new terminal surfaces and connecting road. Asphalting…

Read more

Teräväniemi wastewater treatment plant

Renovation increases the efficiency of the Äänekoski wastewater treatment plant Äänekoski is a lively industrial…

Read more

Mikonkeidas wind farm

The construction work for Mikonkeidas wind farm in Kristiinankaupunki has been started. During 2023, the…

Read more

NYAB constructs a new building to SSAB’s plant in Raahe

NYAB constructa a new building to SSAB’s plant in Raahe. The building will replace old…

Read more

Relocation of cultural buildings

In the communities of Malmberget, Gällivare and Koskullskulle, a large project is currently underway with…

Read more

The Juurakko wind farm in Kalajoki

NYAB involved in the construction of Finland’s first industrial-scale hybrid power park   The Juurakko…

Read more

House relocation & land

Relocation of cultural construction, casting, water & sewage system and constuction of new developed housing…

Read more

Bridge over GC road

Construction of bypass for Riksväg 45 before the start of the bridge construction. Shaft of…

Read more

Fiber work

Sealing of existing fiber network within Domsjö-Vårby Strand. The work includes sewerage, fiber blowing, welding,…

Read more

PT33 Vaikijaur

Shafts, filling, concrete, ducting, maneuvering, fences for 130kV and 40kV switchgear.

Read more

The Lillholmschool

Demolition of 3 school buildings, land and water works for two new school buildings.

Read more

Pipe bridge replacement Odensala

Replacement of pipe bridge under E4 for. Traffic was diverted from one half of the…

Read more

HS-Magasin

Construction of deposition pond for highly sulfuric material. Includes shaft and fill of 1,700,000m³ of…

Read more

NLC Storuman Stage 2 – Triangular tracks

Terracing for a new railroad between the terminal and the inland track. The work includes…

Read more

Wind farm in Pajuperänkangas, Haapajärvi

NYAB builds wind farm for ABO Wind in Pajuperänkangas in Haapajärvi. The contract includes wind…

Read more

Lumivaara Wind Farm

NYAB is building the Lumivaara Wind Farm in the municipality of Hyrynsalmi in Kainuu. Eight…

Read more

Poikkimaantie bridge across Oulujoki river meets the needs of the growing city of Oulu and the port

Skarta is involved in the development of the largest neighbourhood to be built in Northern…

Read more

Jokikylä bridge in Oulu

During the project, a completely new bridge over the River Kiiminkijoki will be built to…

Read more

Sitema to design Herva-Nuojuankangas power line

Sitema Oy has been selected as the general design consultant for Fingrid’s 400kV Herva-Nuojuankangas power…

Read more

NYAB is building pumping stations of Tampere region’s new central wastewater treatment plant

NYAB started in June 2022 building of two pumping stations that serve the entirety of…

Read more

Skarta is building a power distribution station of Fingrid’s substation in Oulu

The service security of the City of Oulu’s electricity supply will improve when Fingrid replaces…

Read more

Kaukanen wind park in Kannus

The construction and ejecting of the wind park of Puhuri Oy’s sister company Tuulikaarron Voima…

Read more

Valkeakoski surface water treatment plant

The new surface water treatment plant in Tyrynlahti is an important water production plant for…

Read more

Unique protection against excavation by blasting in the style of Formula 1

LKAB is extracting ore in the open-pit mine in Svappavaara. At the time of the…

Read more

Additional building for pellet storage at Norrenergi

The energy company Norrenergi wanted to divide a pellet storage into two parts at the…

Read more

Pajukoski wind farm

Pajukoski wind farm Skarta Finland (former Suomen Maastorakentajat Oy) flagship project of wind power construction was…

Read more

Tampere outdoor swimming pool

After decades, the wish of Tampere residents for an outdoor swimming pool was fulfilled when…

Read more

Kalajoki central water treatment plant

The Kalajoki central treatment plant, built by NYAB (former Suomen Maastorakentajat Oy) for Vesikolmio Oy,…

Read more

Kuuronkallio wind farm

In the wind farm project of WPD Finland Oy in Kuuronkallio, Kannus, Skarta Finland (former…

Read more

Skarta involved in the final phase of LKAB’s LabSAK project

LKAB’s goal is to produce the best pellets in the world, and LKAB invests heavily…

Read more

Nenäinniemi sewage treatment plant

The Nenäinniemi sewage treatment plant in Jyväskylä plays a major role for the entire region….

Read more