First of its kind in Finland – Skarta had a major role in the closure of the Hitura mine

21.10.21

Hitura mine in Nivala went bankrupt and needed to be closed down. The closure was a long project and included several surprises. The project was completed on schedule in September. Thanks to Skarta, the large pond areas have now been processed to be safe, and the hectare-wide leftover stone piles are growing clover.

A nickel and copper mine has been located in Nivala, Northern Ostrobothnia, since 1970. Its latest owner, Canadian Beldevere Mining, went bankrupt in 2015, and in 2017 the Northern Ostrobothnia Centre for Economic Development, Transport and the Environment (ELY) decided on the closure of the mine in accordance with the environmental permit. The project has been massive in terms of hectares, working hours as well as expenses. Excluding close to two million euros of guarantee financing of the mining company, the costs of approximately 20 million euros have been paid by the government.

The two-stage closure operation took four years and was completed in September, but the active water purification in the area will continue for years. A mine closure project of this large scale has never been done in Finland before, nor any with these structures. The area of the mining concession is around 350 hectares in its entirety, of which around 100 hectares is the actual actively used land that is closed down.

The most important and critical part of the work was the protection of waters: part of the mining concession is groundwater areas and a nearby river, Kalajoki, was in danger of being contaminated as well. In addition, ore-dressing sand in the air caused environmental and residential disturbances in nearby areas. All problems were able to be solved, and the waters were rescued.

Enormous tailing ponds and steep moraine piles

In the first phase of the project, focus was in conveying the contaminated waters of the area for purification. Fortum Waste Solutions Ltd was the main contractor in the first phase. The second phase of the closure began in May 2019 and was ordered from Skarta. The work included covering the tailing pond and the settling pond, as well as processing the leftover stone piles to be safe and landscaping them.

Ponds, covering several hectares altogether, needed to be treated so that rain and melt water cannot flow through them and mix with groundwaters. Ponds with their whirling ore-dressing sand were covered with a tight layer of moraine, and layers of clay and soil were set over it. Clover and some other grasses were planted on top for landscaping and to prevent erosion.

Contaminated leftover stone piles of the mine, that were surrounding the ponds in the area of around 20 hectares, were dozens of meters tall and steep and also needed to be processed to be safe. The piles were made more gently sloping and they were compressed with clay and topsoil. Ditches were dug around the piles to convey rain and melt waters out of the area in a controlled manner.

Surprises in the ponds

“When we arrived at the location in 2019, some ponds were still covered with rain and the ground was practically soft sludge. It was impossible to even walk in the area, not to mention large machines. We started the work by drying the ground to improve its carrying capacity, so that we could start the actual work”, Matti Helaakoski, CEO of Skarta Infra (Niskasen Maansiirto) describes the beginning of the project.

The cloudy water in the ponds was also challenging because nobody could see what should be expected underneath. As the mine was from the year 1970 and had seen several owners, and everything hadn’t previously been documented according to current requirements, there was no exact information on the structure of the ponds even in paper.

Timo Karjalainen, leading water management expert at the Northern Ostrobothnia Center for Economic Development, Transport and the Environment tells that the dam structures of the ponds were expected to be moraine, for example. It was planned to be used for the covering of the ponds, but it was discovered that some of the embankments were made of ore-dressing sand that wouldn’t be used anymore. This caused, among others, new arrangements for conveying water and larger-than-expected need for moraine at the working site.

That is to say that there were surprises on the way and the work plans needed to be reconsidered during the project. According to Karjalainen, Skarta was proactive and often came up with solutions to the problems, such as moraine. When enormous amounts of land masses, more than originally estimated and ordered, were needed, Skarta figured out to dig moraine and clay in the mine concession area, which had several positive effects:

“Of course, it was faster and cheaper to get soil from nearby. It also significantly reduced the traffic of heavy machinery, which was important for residents of the area especially from a safety perspective, as a school is also located near the road that goes to the mine area. Digging in the mine concession area also did not cause as heavy burden as working on unspoiled land could have done somewhere else. In addition, digging areas became bowls that we can further use in water treatment, for example.”

Documentation on track

All in all, work in this rare and massive project went smoothly and on schedule despite the challenges. Karjalainen thanks Skarta for the surprisingly flexible attitude to surprises and changes.

“The project left a very positive image. Site managers knew their job and documentation was on track as well, which is very important nowadays. I received all reports, quality assurance documents and all other papers without delay or asking. The whole crew did a high-quality job. Also, spirit at the working site was good, which is extremely important and affects the result of the work.”

Read more

NYAB Södertälje

NYAB undertakes extensive water work in Södertälje Canal

Read more

Meet Supervisor Enna Ruonala & Quality Manager Hanna-Kaisa Vesa

Read more

NYAB wins turnkey contract for railway project

Read more

NYAB Plc’s Annual Report 2023 and Notice to the Annual General Meeting

Read more

NYAB plans to carry out re-domiciliation to Sweden through a cross-border conversion and has applied for the delisting of its shares from Nasdaq First North Growth Market Finland

Read more

NYAB signs letter of intent to acquire marine construction company

Read more

Meet Patrik Nilsson – Business and Estimating Manager at NYAB Mälardalen

Read more

NYAB Plc’s financial statement release 2023: Strong growth in cash flow and order backlog

Read more

Meet Patrick Kraft – Site Manager at NYAB

Read more

NYAB signs turnkey contract for Duroc Rail AB’s new industrial building at Luleå Industrial Park

Read more

NYAB signs contract with Swedish Transport Administration for additional projects within Opto 2.0

Read more

NYAB receives additional order from LKAB in urban relocation project

Read more

Olli-Pekka Purhonen

Meet Olli-Pekka Purhonen – Solar Power Construction Project Director

Read more

Meet Martin Wäppling – Work Manager at NYAB

Read more

Mattias Broström appointed CEO of NYAB Infrastruktur

Read more

Sijoittajat -sivun kuvituskuva

NYAB approves revised long-term financial targets and a new strategic plan for 2024–2026

Read more

NYAB to construct solar farm developed by Skarta Energy to Utajärvi

Read more

Meet Karin Engfors – Site Manager at NYAB

Read more

NYAB’s Q3/2023: Improved profitability

Read more

NYAB signs a contract for an extensive power line work in Luleå

Read more

Pauli Lahti

Meet Pauli Lahti – Sales Manager at NYAB

Read more

NYAB signs a significant agreement to start constructing Aurora Line

Read more

Hanna-Kaisa Vesa

Quality at every step

Read more

Meet Lina Lundqvist – Construction Engineer at NYAB

Read more

Fingrid 100 kV sähköasema

NYAB to build a 110kV substation for Fingrid in Loimaa

Read more

Meet Göran Sandberg – Measurement Coordinator at NYAB

Read more

Kalajoen Hiekkasärkkien liittymän alikulku

Infrastructure team working diligently in North Ostrobothnia

Read more

NYAB is preparing move to Sweden – Jan Öhman as new Chairman of the Board

Read more

Elin Åhrberg

NYAB appoints Elin Åhrberg as a new member of the Executive Management Team

Read more

Veli-Matti Kumpula

Meet Veli-Matti Kumpula – Site Manager at NYAB

Read more

NYAB begins work for Talga at Europe’s first commercial battery anode refinery

Read more

NYAB Plc’s half-yearly report 2023 – latest videos and management views

Read more

NYAB Plc’s half-yearly report and management webcast: Strong growth and development despite macroeconomic headwinds

Read more

Jenni Autio toimii NYABin työmaalla työnjohtajana

Traveling fuels interest in work

Read more

Meet Fredrik Fällback – Site Manager at NYAB

Read more

Meet Victor Tanndal – Work Manager at NYAB

Read more

NYAB signs a framework agreement with Stockholm Vatten & Avfall

Read more

Meet Ronny Toma – Work Manager at NYAB

Read more

NYAB implements expansion projects of Utanen and Isokangas 110kV substations in Northern Ostrobothnia

Read more

Antti Keskinen, Liiketoimintayksikön johtaja, Sähköverkkorakentaminen | NYAB

Green transition speeds up NYAB’s electricity transmission network operations

Read more

Anton Sandgren – Site Manager at NYAB

Read more

NYAB signs two new contracts with Svenska kraftnät

Read more

Ensuring safety through cooperation

Read more

NYAB wins SEK 66 million contract at Arlanda for Swedavia

Read more

NYAB wins two contracts in Kiruna municipality – infrastructure projects for Infranord

Read more

NYAB as the company of the month

Read more

Matilda Stjärnström – QHES Manager, NYAB Sverige

Read more

NYAB Plc: Annual report 2022 has been published

Read more

NYAB infrastruktur, järnväg, vägarbete

NYAB signed 10 MEUR agreement with Swedish Transport Administration

Read more

NYAB Plc’s financial statement release 2022 and management webcast

Read more

Over EUR 13 million in investment aid for Skarta Energy’s solar farm to be built in Utajärvi

Read more

NYAB and Energiequelle sign BoP contract for Mikonkeidas wind farm

Read more

NYAB approved as a builder of transmission lines in Fingrid’s supplier register

Read more

NYAB signs a contract to prepare for the construction of Aurora Line

Read more

Skarta Energy and Solarigo’s 61 million euro solar farms project enabled by investment aid

Read more

NYAB-logo

SkartaNYAB renamed to NYAB

Read more

Vastuullisuus noston kuva

SkartaNYAB establishes a joint venture with CapMan fund to construct renewable energy producing facilities exceeding 500 MW

Read more

SkartaNYAB Plc changes its name to NYAB Plc and sets strategic objectives for 2022-2024

Read more

Fingrid concludes first solar power plant connection agreement with Skarta Energy – Utajärvi project moves forward

Read more

NYAB was accepted into Fingrid’s supplier register

Read more

Skarta and Tohmajärvi municipality to begin cooperation – Eastern Finland’s largest energy project under planning

Read more

Utajärvi

Skarta’s Near Energy project in Utajärvi is progressing – action permit for a solar power plant and Horizon research funding from the EU

Read more

SkartaNYAB strengthens its position on the energy construction market in Norrbotten by acquiring Power Forze AB

Read more

Sitema has been awarded ISO 9001, 14001 and 45001 certificates

Read more

SkartaNYAB and Uusiutuva Energia Karahka Oy have signed a BoP agreement for a Karahka wind park in Oulainen

Read more

Skarta will build a wind farm in Pajuperänkangas with a new customer, ABO Wind

Read more

UKI Arkkitehdit Oy

Skarta signed a contract with SSAB regarding construction project of new office building, as well as research and laboratory facility, to Raahe plant

Read more

Skarta and the Centre for Economic Development, Transport and the Environment for Lapland signed an extensive contract on the Jokikylä bridge in Oulu

Read more

SkartaNYAB has signed a comprehensive framework agreement with the Swedish Transport Administration

Read more

Skarta signs two contracts with LKAB for the execution of infrastructure projects

Read more

Skarta will be making everyday life effortless and clean also in Pirkanmaa – Skarta was awarded the contract for the building of pumping stations for Tampere Region Central Wastewater Treatment Plant

Read more

NYAB wins customer trust

Read more

NYAB signs extensive agreement with Piteå municipality

Read more

Magnus Granljung takes over as CEO of NYAB

Read more

The strongest actors in solar energy to cooperate – Skarta and Solarigo aim to build 1,000 megawatts of solar power

Read more

Skarta founded a new business unit – electrical grid business to complement the value chain

Read more

vidja

NYAB moves cultural buildings on behalf of LKAB

Read more

vidja

NYAB signs framework agreement with Huddinge municipality

Read more

vidja

NYAB is awarded three projects in the Ore Fields

Read more

NYAB is awarded an energy project in Umeå

Read more

NYAB is awarded the “Operating area Överkalix & Övertorneå” by the Swedish Transport Administration

Read more

Tuulivoimalan perustukset raudoitustyön alkuvaiheessa Juurakon tuulipuistossa Kalajoella. Laadunvarmistus on olennainen osa työvaihetta, ja siihen mennessä työmaalla on dokumentoitu jo monta suunnitelmaa ja pöytäkirjaa.

Quality is the basis of everything for Skarta

Read more

Skarta joins forces with Swedish NYAB Group to step up the pace of building a clean future

Read more

Skarta, builder of a clean future, developed a model for the calculation of CO2 emissions that relate to the infrastructure of wind farms

Read more

NYAB contracted for projects in Stockholm and Umeå

Read more

Near Energy at the center of the development of Skarta’s energy business

Read more

vidja

NYAB is awarded an infrastructure contract worth 130 million for Huddinge municipality

Read more

Skarta aims at being at the forefront of hydrogen economy – acquires the first new-generation hydrogen car in Finland for its use

Read more

NYAB wins assignments in the Stockholm area

Read more

The bridge over Siikajoki, built by Skarta, was opened to traffic

Read more

Skarta completed the construction work for the Jämsä central sewage treatment plant three months early

Read more

New project for Skarta in Metsä Group’s bioproduct mill site

Read more

NYAB is building a wind farm in Kalajoki at full power

Read more

Skarta has launched new financial targets and strategic main directions – Activities will be expanded towards overall projects in wind power, solar energy, and hydrogen solutions

Read more

Trading in Skarta Group Plc’s new shares began on the First North marketplace

Read more

Skarta’s journey to become a First North company is progressing according to plan – the Board of Directors to have strong expertise in the energy sector

Read more

Skarta got an order worth MEUR 10 from LKAB

Read more

Skarta to build the foundations for EPV Energia’s wind farm in Närpiö

Read more

NYAB wins the Group’s largest contract of all time

Read more

Kuvituskuva, nainen ja mies tietokoneella

Job opportunities at Skarta

Read more

vidja

NYAB is awarded assignments by Nacka municipality and the Swedish Fortifications Agency in Kiruna municipality

Read more

Skarta Group seeks momentum for growth on the stock market

Read more

Skarta to partner with Atria on a major wind power project

Read more

NYAB is building a new road and bridge for Skellefteå municipality

Read more

Skarta Energy Oy to be a new wind power subsidiary

Read more

NYAB is awarded a bridge contract in Stockholm

Read more

Skarta Finland started work on the construction site of the Kemi bioproduct factory

Read more

HS-Vesi invests in Paroinen treatment plant in Hämeenlinna

Read more

VSB selected NYAB as the main contractor for the Juurakko wind farm

Read more